About us
A Hong Kong partner for wooden components.
Forest Bond HK Limited supplies wooden components and cleaning tool parts — round dowels, square strips, wooden hangers, broom heads and handles — to importers, distributors and private label buyers in Europe and North America.
Work starts from a specification: a drawing, a sample or an existing item. Dimensions, surface finish and packing are agreed before production, and each order is produced to the approved reference.

Painted handles, colour matched to the approved sample before wrapping.
How an order runs
From timber to carton.
Four stages are reviewed on every order, so the part that arrives matches the part agreed on paper.
- 01
Timber selection
Stock is graded for straightness and visible defects before machining, with species confirmed against the order.
- 02
Machining
Dowels, strips and handle blanks are cut and turned to the agreed diameter or section, then inspected in batches.
- 03
Surface finishing
Pieces are sanded and, where required, painted or printed to the approved reference before assembly.
- 04
Packing and inspection
Finished goods are bundled and cartoned against the packing plan, with quantity and finish checked before dispatch.
Ways to work together
Wholesale distribution
Bulk dowels, strips and handles for importers and distributors building a stock range.
Private label (OEM)
Finished hangers, broom heads and handles packed under your brand for retail programmes.
Specification customisation
Dimensions, finish and packing adjusted to a drawing, sample or existing product line.
Company facts
Details still being confirmed.
Figures for operating history, capacity, certifications and export markets are not published yet. They will be added here once verified rather than estimated.
Ask for current detailsYears in operation
Details to be confirmed
Production capacity
Details to be confirmed
Certifications
Details to be confirmed
Export markets
Details to be confirmed
Working on a private label programme?
Share the item, target quantity and packing requirements. Specifications, MOQ and lead time are confirmed in the quotation.